Answer Posted / pradeep
Tremie concrete is placing of concrete by tremie pipe for
piling work where concrete compaction done by movement of
pipes up and down. Slump is very high for such concrete.
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
how many types of survey and what are levelling instrument?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What is the tallest man made structure in the world?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Explain what are the skills required to become an architect?
How will be cutting in timber plate size 600*400 column size
Howmuch bend to be provide for 200/600 BEEM
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
how can calculate cutting length of diamond ring
What is passive earth pressure ?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same