How to calculated +ve & -ve Bending moment coefficient in
water tank design for design of side walls.
Answer Posted / p.dhinakaran
Its Purely Based on the support condition and Type of the
wall(i.e Fixed condition)
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What is factor not to be taken in consideration in mix design?
Wat is meant by Aecron brick?
What is rolling stock
What is the largest concrete dam in the world?
What applicable rate of wct in bihar
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
The 4 main factors to start a construction project are––
What is the difference between linear dimension and aligned dimension?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What is OSHA compliance?
why +1 to be followed for calculating the no of bars in BBS. Please explain
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum