Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculated +ve & -ve Bending moment coefficient in
water tank design for design of side walls.

Answer Posted / p.dhinakaran

Its Purely Based on the support condition and Type of the
wall(i.e Fixed condition)

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

2270


How to construct a water sump in a rocky soil?

2218


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1964


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1979


Why are pull-out tests performed for soil nails?

1181


What do you mean by tolerance factor of concrete ?

3160


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3992


how much repeitation for conventional and maivan formwork?

2020


undistributed samples are obtained by

2413


where can i get the previous question papers for rrb section enginerr (civil)

2343


what is the design procedure for building

2317


Bernaullis theorem deals with the law of conservation of mass momentum energy none

2029


what is the name of shuttering oil used in oman

2831


400 ku d/c clearess ketan hota hai?

2043


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

2307