how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?
Answer Posted / c.m.vijaya kumar
10 sqm or 10sqmx.115m =1.15 cum
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
cause of cylinder test failure
Explain major difference between auto level and dumpy level?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
How much time Required for PPR pipe network testing
how to calculate MR 9(derivation)
what"s the sort of beams?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Consumption of Binding wire for fixing of cover block in vertical surface
how much one carpenter can doing shuttering of slab in one day
what do you understand by M25 concrete
how do we design mix ratio?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
what is w/c ratio in dry lean concrete for m10 mix design