Explain the Term in CT Name Plate – Class: 5P10

Answer Posted / r. r. patange

In 5P10, P stands for protection, there are two main
classification of current transformer
1) Metering CT
2) Protection CT
so above mention CT can be use for protection purpose.

the first digit (5) stands composite error.
composite error - it nothing but the differance between
instanteneous RMS valuve of primary current and secondory
current, multiply by transformer ratio.

the last digit (10) is stand for the times of primary
current. It means this protection CT can capable of
measuring current of 10 times than its rated during fault
condition with error of 5% and without getting saturated.

Is This Answer Correct ?    31 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the operation of grid connected central solar inverter ?

1016


impliment (AB)`+C to transistor representation

1320


Either the Armoured Earthing strip of HT 3 core cable have to pass through CB CT or not , why ???

1535


what is excitation/

1710


Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.

1478






I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com

1350


WITCH CARDS IN USE IN FIRE CONTROL PANEL.

1444


11kV capacitor bank of rating 2.4KVAR, is charged with protective relays of only over current & Earth fault &.......without Over Voltage, Under Voltage & Neutral Displacement Relay. Is it advisable??

1185


What is a copper loss or i2r loss pc?

694


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2358


what is meaning of sympathetic tripping with respect to relays and give the values for current carrying capacities for copper and aluminium cables from 16sq mm to 500sq mm

4348


what is metering cum synchronizing panel and how it is used?

3963


Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?

945


why in the three pin plug all 3 pins are cutted ?

1521


what are the things that can cause a three phase motor to crawl?

2858