If got selected in ur company, what will u do for ur
company?(IN P.M)
Answer Posted / ramprasad.s
hI
1. I will comple the Job as per schedulre/in time.
2. I will Inprove the Business By delivering the quality
of work.
3. I will Improve the Process of work.
4. I will give lot of suggestions to Improve the
business.
sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
difference between change management and configuration management
What is known as data-driven testing?
Hi, Im B.E 2011 pasout,worked in back office till now, but now im searching for job into manual testing with fake exp of 1 year..Plz suggest me how to prepare for an intervw? how to gain real time testing knowledge? Is dere any site where i can practice testing?
what is the difference between Desktop testing,Client/server testing and webapplication testing
List the type of testing perform to test microsoft excel 2003 give atleast 1 example of each type
I have an UI issue "please fill out this field" pop up in firefox browser keeps scrolling with the page is it valid???
approx how long a simple website take time just for manual testing including report generation.
What is integration level testing?
i have source and target having same data structure 500 fields and one lacks records. how to validate data. write 5 scenarios.
Why do you need to parameterize fields in your virtual user script?
what are the test bugs
Do you use any automation tool for smoke testing?
Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning
How can you prepare the resume for testing? Can you send me the answer for this questions?
Tell some examples of bug severity and bug priority?