material calculations for I st coatplastering 16mm CM
(1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime
stone masonry CM(1:6)
Answer Posted / d k panchal
2400
Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What are your goals?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What is absolute coordinates?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
why do we not deduct volume of steel to find actual volume of concrete in practical???
what"s the sort of beams?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
what are the Task work of different labour.?