hi ,
can anybody help me about the following doubt......
what is the difference between clear cover, cover and
nominal cover to reinforcement ?
Answer Posted / kishore bangaru
COVER IS THE DISTENCE BETWEEN CENTER OF THE REINFORCEMENT
TO BOTTOM OF SLAB OR BEAM. CLEAR COVER MEANS THE DISTENC
BETWEEN BOTTOM OF THE REINFORCEMENT TO BOTTOM OF SLAB OR
BEAM. AS PER SPECIFICATION THE MINIMUM COVER IS CALLED
NOMINAL COVER IT IS DEPENDS ON STRUCTURAL DESIGN.
| Is This Answer Correct ? | 23 Yes | 2 No |
Post New Answer View All Answers
How to calculate carrying capacity of the existing water supply trunkmain
What are the alternate material for steel, Sand and aggregate
What is Base Shear ?
The concrete slump recommended for beams and slabs; is?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
How to calculate canal slope curvature qty!
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
how to workable concrete cube test M-25 design mix
what is the service corridor?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?