Answer Posted / guest
the building is constructed infront of the garden
| Is This Answer Correct ? | 0 Yes | 31 No |
Post New Answer View All Answers
what is BPM in concrete demolition hammers. what is better a higher value or lower
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What in bending moment, if a moment is free end of cantilever beam?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What difference comes in constructing of house and a housing complex like society
What is critical path method (c.p.m)?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
What is the Maximum %age of Steel in columns and beams ?
Define What is the meaning of a blue land surveyors flag?
Please design 12.5m long dubbly beam
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.