is there zone 6 for earthquake in india?
on what basis the naming of the zones are done in variuos
countries?
Answer Posted / rahman
There are 5 zones in india
1) Zone 2 is least or no danger
2) Zone 3 is little danger
3) Zone 4 is medium danger
4) Zone 5 is danger zone
5) Zone 6 very dangerious
Mostly zone 6 is near himalaya region & they got from Fault
plate location around the countries. They based on tectonic
behavior of plates.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
how we check the thickness and line of ceiling plaster.
how to find out hard strata in bored pile when the DMC method adopted.
What is different between DI Pipe and CI pipe?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
how to clculate the %of concrete strenght achive after curing?load
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
what is the difference between replacement of cement by groundnut shell ash
List out some of the software program that can be useful for architect?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
how to design and calculate materail quantity for concrete speedbreaker ?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What is componsation
what's the formula for calculate pcc for matt(45mm aggregate)?