standared weighs for differnt grade of concrete
Answer Posted / sourabh
25kn/m3
Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
What is quantity of cement and sand required for 2000sqft of tiling?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
I am called for interview from north east power plant .so, I need some interview question which may help me.
Technical Question of Civil Engineering
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
how to calculate total cost for slab 35'Ă—8'
What quantity of 1.0 m3 bricks required?
how i get all type of short type question answer about civil engg
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
what are the five benefits of using standard terminology in the measurement process?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What are segregation and bleeding?
Which tests are performed on soil to decide the type of foundation to be provided.