Answer Posted / adil nadeem
Bills of quantities is a document prepared while tendering
which includes various items of works involved in a
particular project , right from the site
clearance /excavation upto the completion of the
project. a brief discription of the item is mentioned
along with a tentative quantity , so that the contractor
can understand the scope of work involved in that
particular item and quote the rate accordingly. later after
executing the work the bill of contractor is paid according
to the work executed as described in the bills of quantites.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
Define What is an ice dam sock?
For the construction project what capital cost has to be taken in consideration?
what is tension & compression of steel bending.
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
How much cement,sand,bricks and water needed for 1square metre brick work?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
Define a polyline?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
What is costing in 100squre feet bricks
how much shouid be the rate for ready mix concrete per cubic meter
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
what is your role of in previous company as a construction manager
The largest size of paper used in plotter to print the drawing made by Autocad .