Answer Posted / adil nadeem
Bills of quantities is a document prepared while tendering
which includes various items of works involved in a
particular project , right from the site
clearance /excavation upto the completion of the
project. a brief discription of the item is mentioned
along with a tentative quantity , so that the contractor
can understand the scope of work involved in that
particular item and quote the rate accordingly. later after
executing the work the bill of contractor is paid according
to the work executed as described in the bills of quantites.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What is the worlds largest concrete dam?
What is the difference between Hinged and pinned in Column ends
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Draw the cross section of a boundary wall and label its part with detailing?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
how much cement and sand required for 100sqm of wall plastering in different proportions
Please design 12.5m long dubbly beam
What are the applications of cad?
Differentiate orthographic and isometric projections?
The definition of national highway
What do you mean by tolerance factor of concrete ?
at what pressure ply-wood is obtained by gluing wooden sheets
What is absolute coordinates?
use ofr concrete as per grade ?