Any body please let me know how to prepare Method Statement
for Bored Cast in situ piles.
Answer Posted / sjtbehera
See in piles some statment are record in field book some
are as follows
1. what is dia of pile
2. what is length of penetraion of pile in one hour.
3. what is the finial depth of termination of pile.
4. what is the cum casting of pile.
5. plate laoad test of pile.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Does VDF add strength to the flooring apart from preventing water ingress?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
is concealed wiring a problem in fly ash brick wall?
In the roof of a pumping station explain briefly the components of a waterproofing system?
density of crush sand & crush stone or grit powder
pile load testing procedure
In cement making,what is meaning of blend,fineness,density.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
States some of the commonly used commands in cad software’s?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Ratio for 4500 psi concrete
What are the skills required to become an architect?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
cause of cylinder test failure
how much of the strength comes from post-production curing