Answer Posted / sjtbehera
MS means Mild steel. that means plain rod . mainly created
by CST ( cold tiwsted)
TMT means Thermo mechanically treated. this method used by
now a days.
Is This Answer Correct ? | 44 Yes | 2 No |
Post New Answer View All Answers
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the purpose of the gap in the road on this bridge?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how many time use of plywood shuttering and IS code
significance of specific surface area of particles?
how to calculate testing date
How to calculate the force on a column of three story building. What should be the base concrete height?.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
what is the weight of 6000 psi concrete in lb/cft?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how i get all type of short type question answer about civil engg
what is conrete grade ,how are depent on concrete grad and size of concrete?
Can we use the flyash bricks in brick bat coba?