Life of Rcc is taken as 100 years. What will be the life of
structure after 10 years. will the strength of concrete increases or decreases.
Answer Posted / adil
rcc gains its full strength in one year from casting.
after that it starts loosing its strenght slowly.
| Is This Answer Correct ? | 14 Yes | 6 No |
Post New Answer View All Answers
Explain what is 1/8 on the architect ruler denotes?
how to design and calculate materail quantity for concrete speedbreaker ?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is the Hardness of M-40 grade concrete, general and theoratical
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What do we mean by partial moment release ??
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
Bernaullis theorem deals with the law of conservation of mass momentum energy none
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations