Why more than one purchase organizations are assigned to
one plant?
Answer Posted / sourabh kumar dass
More than One Purchase Groups makes :
1. Better Inventory Control.
2. Effective Materials management.
3. Responsible Procurement.
4. Areawise Ownership and Availability of Spares.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is setup time?
I have problem in APFC panel -0.44 while load ON time, i have replaced APFC display & checked the CT supply are ok. how to solve the problem
What is the specification of transformer?
Share with us about a time when you had to present a proposal to a person of higher position and were able to do it successfully?
How important are statistics in industrial engineering?
Write a C++ code that print the largest two among three numbers
How do you estimate the fuel /diesel consumption for 125KVA DG Set?
What are the areas where I need to make improvement? (Please provide examples and suggestions for improvement).
Why cnc machine installed in dustproof room?
Can you calibrate, troubleshoot and repair instruments? Which tools do you use for the same?
What is load line in control valve?
Define productivity?
What is the formula for converting litre in to pale?
what is a benifit to configure site to site vpn ?
I want to know about a good liquid scrubber that we can use in acid washing.