If the client identified some bugs to whom did he reported?
Answer Posted / btech
He will report to the Project Manager. Project Manager will
arrange a meeting with all the leads (Dev. Manager, Test
Lead and Requirement Manager) then raise a Change Request
and then, identify which are all the screens going to be
impacted by the bug. They will take the code and correct it
and send it to the Testing Team.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
What is control structure testing?
What is quality circle?
Explain fault?
what are all the folders maintained in memory location?
What is gorilla testing?
Explain glossary of software qa/testing?
Hi, I am writing ISTQB foudation exam on 9 June 2010. Anyone please send me pdf of the book "Sample Exam Questions: ISTQB Certified Tester Foundation Level (Paperback)by John A. Estrella " to hsdantot@yahoo.com Thanks Sree
WHAT ARE THE VARIOUS RISKS INVOLVE IN TESTING?
How do the companies expect the defect reporting to be communicated by the tester to the development team. Can the excel sheet template be used for defect reporting. If so what are the common fields that are to be included who assigns the priority and severity of the defect.
When is used decision table testing?
What is non-intrusive testing?
What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering
can any one suggest best institute for SAP TESTING and scope in SAP TESTING
Why are static testing and dynamic testing described as complementary?
What is sei - software engineering institute?