Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why should we india maintain frequency of 50 Hz.

Answer Posted / bitm

it is the standard value to manufacture any electrical
equipment in India.

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what may the reason for vector shift in a generator?

1853


Why are iron cores in transformers made laminated?

1094


How to do maintenance of transformer feeder.

1837


What is minimum phase system?

1119


How the circuit breaker is selected for Induction motor of 100 kW, 415 volt, 0.85 power factor, 0.95 efficiency ?

1588


if i am in front of transmission line how to know that current direction without any equipment

1748


we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain

2202


why the earth is taken minimum in supplying? wather it the proportional factor to getting work any equipment or a power plant?

1872


show the single line diagram of star delta starter with single phase preventer

4611


what topics we have to concentrate for power grid et.written test.and tell what to read for english synonyms and antonyms.

1930


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

1956


what is the calculation formula for motor starting torque,running torque, running torque.

1673


I need model question papers for RRB section engineer Chennai... Please send to my E-mail Id:- maitheerainbow@gmail.com

1927


nwhat are the main Components of servo motor?

2068


How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?

2028