how do we calculate wastage of steel in the site,what r the
items to taken into account for wastage calculation?
Answer Posted / anoop didwnaiya
2% of the project only
Is This Answer Correct ? | 3 Yes | 11 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what"s the sort of beams?
Can we use the flyash bricks in brick bat coba?
How many kilo-newtons equals 1000 kilogram?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
to minimize budget cost of building , what can i do
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
important question on stones
What out turn civil works
How much material will consume for following specification water tank (9*7.5*6 feet)?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
how much of the strength comes from post-production curing