adspace
Answer Posted / satya dev
As per IE rule Minimun 2 nos earting required Motors & Both
must be connected in Parallel.
| Is This Answer Correct ? | 20 Yes | 1 No |
Post New Answer View All Answers
I am apply the AAI. So i want electrical sample question paper in technical with answer my id is vijayjobsmart@gmail.com
what is meant by IGBT how they differ from tyristor ?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
What types of high speed CMOS circuits have you designed?
sir, I am from EEE branch.On feb 17 iam going to write an Exam for hindustan petrolium corporation Ltd.So plz send me the written exam pattern/Q's/interview questions.please mail to eee_dharmendra@yahoo.com
where can i get vijaya electricals limited in hyderabad interview auestions can u give me the website address plz
hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds
Hi friends, i m electrical engineer i want a cdr for migration purpose so anybody have information about this then send me on jayesh_ee88@yahoo.com.please try to me
how to interlock 3 nos MCCBs using under voltage coil. please provide me circuit diagram?
could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com
If not into production, how far did you follow the design and why did not you see it into production?
why and how voltage sharing in transformer, during magnetic balance test ?
How much minimum insulation required between 11kv/3.3kv transformer windings?
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)