Answer Posted / parth belani
when there is a frequent requirement of some application
(for example, square or cube of numbers) in some program,
if every time we do the calculation, the length of the
program can become very large. In such applications, we use
the look-up table to considerably reduce the size of the
program. Look up tabe is a predefined table in which one
answer is corresponding to every number. for example, 1-->1
2-->4, 3-->9, 4-->16.... will be the look-up table for the
square of a number. Whenever in the program, there is an
application of squaring a number, we don't need to do the
calculation. what we need to do is just to relate that
number with the one against it in the look-up table. We
need to reserve required amount of memory for the look-up
table.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is the minimum clearance between a 11KV 150KVAR capacitor cell and series reactor.can a series reactor can be mounted in the same structure of the capacitor cells structure
WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL
Would you recommend to replace all oil filled cables with xlpe cable for hv transmission with the current technolgy for xlpe cable?
how will calculate the safe starting current of 3-phase squirrel cage induction motor?
what is upper impedance and lower impedance of a distance relay
What are the main significances of root locus?
When calculation of fault current and fault Kva is to be done,why always we use per unit value and why we consider the base kva?
What is the actual calculation for transformer short circuit test?.
Motor,transformers,capacitor tubelight etc....
Explain few advantages of electric traction system?
hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com
WHAT IS THE CURRENT CARRYING CAPACITY OF 2.5/3 CORE HI TUFF CABLE,WILL IT SAFLEY CARRY 8.6 AMPS OVER 120 METRES,CAN YOU ALSO ANSWER WITH FORMULA FOR WORKINGS OUT ,THANK YOU 3RDYR APPRENTICE.
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
how to size H.T & L.T Panel ?
Can we put 3 layers of cable tray while installing tray