a compressor running at 100 rpm gives 40% efficincy speed
increase from 200 wt will be the efficincy???????????
Answer Posted / jaykumar
the efficincy incresed
Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
Name four important properties of a good refrigerant.
What is the percentage of carbon in cast iron ?
What is the weight of 1m3 of seawater?
can anybody provide me the HPCL apptitude papers?am having the test on this feb 19th 2008 so plz
Where can you find space heater lam p and what is its purpose?
What do you mean by the term thread size please explain what does 0.125 inch stand for in 0.125 inch npt thread?
what is varible
if any one attended caterpillar placement pls send the model questions and the question pattern.....
Which material grade is better for low temperature application upto -20 deg C either IS 2062 GR B OR IS 2062 GR C ?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is the difference between Over Molding and insert molding ?
Why should a chain drive be used over a belt or rope driven drive?
sir most regardly i want previous papers of your company for my preparation of my written exam
What is add number
what is the exams to be conducted for mechanical engineers and then how to prepare that