M20 means
The mix ratio will be = 1:2:4
That is Cement : Sand : Aggregate
To find out the weight
Add there all = 1+2+4 = 7
1.54 is the design constant
Then for cement (1/7)*1.54 = 0.22m3
One bag (50KG) of cement = 0.0332 m3
Therefore cement required in kg = 332 KG/m3
For sand = (2/7)*1.54 = .44
i.e. = 2*332 = 663 Kgs /m3
For Aggregate = (4/7)*1.54 = .88
i.e. = 2*663 = 1326 Kgs /m3
water cement ratio = 0.42*332 = 140 Kgs
Therefore the weight of one cubic meter of -
Concrete for M20 mix (1:2:4) = 2461 kgs
After exact & all calculations it will come = 2500 kg/m3

Is This Answer Correct ?    46 Yes 45 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

whaat is blister in box girder bridge and what is its function..

4390


What are the reasons for geotechnical site investigations in uganda?

656


What are the composition of a landfill?

689


What is the meaning of a blue land surveyors flag?

787


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

2508






how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1022


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5735


How much of the strength of concrete comes from post- production curing?

2656


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

1813


What are the methods of measurement? Describe it shortly

1793


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1783


Why steel rods are produced only in even dimensions?

2163


What is Curtailing of R/F

1988


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1359


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1472