plz tell.. how can we find weight(in kg) of 1 cum of m20
mix..? how can we find the ratio of cement sand and
agregate on site i.e if we given some amount of m20 mix
then hw we find the ratio..?
Answer Posted / syed zafar
M20 means
The mix ratio will be = 1:2:4
That is Cement : Sand : Aggregate
To find out the weight
Add there all = 1+2+4 = 7
1.54 is the design constant
Then for cement (1/7)*1.54 = 0.22m3
One bag (50KG) of cement = 0.0332 m3
Therefore cement required in kg = 332 KG/m3
For sand = (2/7)*1.54 = .44
i.e. = 2*332 = 663 Kgs /m3
For Aggregate = (4/7)*1.54 = .88
i.e. = 2*663 = 1326 Kgs /m3
water cement ratio = 0.42*332 = 140 Kgs
Therefore the weight of one cubic meter of -
Concrete for M20 mix (1:2:4) = 2461 kgs
After exact & all calculations it will come = 2500 kg/m3
| Is This Answer Correct ? | 46 Yes | 45 No |
Post New Answer View All Answers
What is the Hardness of M-40 grade concrete, general and theoratical
explain what do you mean by the property development.
How many square meter can a worker/labor demolish a structure per day?
What is the substitute of Mastic Asphalt?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
How to make a c++ program that converts any base to base 10?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Describe the various methods of concrete curing?
how to estimate material requirement for an area of house in square feet?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is the effect of a building collapse?
During reclamation how can the occurrence of mud waves can be rectified?