Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS MEANT BY STABILITY?AND WHY CHECK STABILITY TEST METHOD IN THICKNESS SIDE?

Answer Posted / sjtbehera

The Stability of a structure as a whole agnaist
overturining shall be ensured so that the restoring moment
shall not be less than 1.2 times . Stability check is to
ensure that the structure can take the desin load. this is
ensure by thickness chaeck.

Is This Answer Correct ?    16 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2678


How is make concrete cube?

1252


What is meant by Crystal Concrete?

1892


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

1199


How to plan a project

2355


how to calculate spacing rod in column

2015


Critical Path Method is...

2165


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

2159


Wat is meant by Aecron brick?

2128


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

2247


please briefly explain calculating or estimating steel quantity for a RCC column?

2026


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

2398


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

2374


Consumption of Binding wire for fixing of cover block in vertical surface

1562


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2520