WHAT IS MEANT BY STABILITY?AND WHY CHECK STABILITY TEST METHOD IN THICKNESS SIDE?
Answer Posted / sjtbehera
The Stability of a structure as a whole agnaist
overturining shall be ensured so that the restoring moment
shall not be less than 1.2 times . Stability check is to
ensure that the structure can take the desin load. this is
ensure by thickness chaeck.
| Is This Answer Correct ? | 16 Yes | 6 No |
Post New Answer View All Answers
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
what r the precaution for high in atp tempareture,low in atp tempareture
2. What are the advantages of your present job, things you like about it?
Define What is an ice dam sock?
What is the purpose of Chipping in the heavy foundation?
For what building Built-on balconies are preferable? What are the advantages?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what are the five benefits of using standard terminology in the measurement process?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
difference between trapezoidal and pedestal footing and how the load acts on that
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?