Answer Posted / pallisseri narayanan
During any fault in an electrical system, voltage and
frequency will reduce and the generating station will try
to recover through Auotmatic Voltage regulation system and
Speed Governor control. The system disturbance depends upon
the magnitude of fault, area where the fault is occured and
the time taken to trip through protection relays. In the
meantime if we can throw out some non critical loads the
recovery and system normalisation will be fast and the
remaining loads will be on safe. Hence we provide load
shedding arrangement through a frequency relay with
different stages of frequency setting. Non critical loads
will connect to the first stage ( for example if the normal
frequency is 50 HZ the first stage setting can be 49.8HZ,
2nd stage 49.5, third stage 49.2 etc;) then the next
prioriy of loads to 2nd stage and the next to 3rd stage.
The settings are done as per the electrical system study.
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
in an electronic tri vector meter when the current and voltage sequence changes ? what is the effect of phase sequence on recording of meter
Good day everyone,currently in our premise we using 30kw slip ring motor with resistance bank which we use as forward and reverse at conveyor bar handling. So,my question is how do we calculate the resistance bank which is suit the motor. Kindly,assist me... thank you
if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value
what is the difference b/w ATS and HTS?
How much voltage we need to apply in 33kv cable during hipot test of cable
WHAT IS counter flux IN CT?
What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)
What is big transformer parts and their function ? Ty
why are the maintaine power factor and how can this control and this is how work.
what is excitation/
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
how many electricity poles are there and what are the names and their sizes.
How to test lightning Arrester?
What is the Surge for 1.1 Phase Induction Motor(For Eg.1Hp) 2.3 Phase Induction Motor(For Eg.1Hp) 3.AirConditioner(For Eg 1Ton) 4.Refrigerator(For Eg 180Ltr or 160kW) 5.Induction Cooker 4. Ceiling Fan
Hi, Next week Iam appearing RRB exam for section engineer. So help me to get modal question papers for this position. Iam very thankful to you. Whether question will be fully techanical format or general form. Please give me a details regarding this exam.