how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / ratheesh
cement = 7.5 kg
sand = .0076 m3
Aggrigate = .015 m3
| Is This Answer Correct ? | 16 Yes | 9 No |
Post New Answer View All Answers
How much material will consume for following specification water tank (9*7.5*6 feet)?
How do you calculate reinforcement weight of steel?
Basic questions of civil engineering
in one SQM plaster how much Cement and sand consumed in ratio 1:4
what is the use of beam end forces while using a staad ? wha they are show
what is the painting co efficient of slope roof tiles?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
Minimum and maximum size of the building components
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is progress payment?
at which depth the construction of tunnel is economical from cost and engineering aspect.
Did any of the egyptian pyramids ever fall down?
How will be cutting in timber plate size 600*400 column size