What is logic behind the use of Steel bar insted of gold
bar?
Answer Posted / mayank
Temperature variations in steel are too low to compare to
other suitable materials
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What is type failure of road surface? how to repair the failure of road surface?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
on what basis the partial factor of safety are decided? form the load combinations
How to find CN by using arcgis 9.3?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
How can I make justification between using concrete grade c35 compare c37?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
What is the zero value in quantity surveying
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
How many square meter can a worker/labor demolish a structure per day?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)