If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D
lap length which dia.should I consider for lapping
Answer Posted / naresh
for lapping of two different dia bars we take 40d for lesser
dia
Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
How many cement sand ballast in cc 1:4:8 40mm
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What are the strongest shapes in building?
what is conrete grade ,how are depent on concrete grad and size of concrete?
rate analysis hiring of generator 62.5 KVA
how much area can be platered by a mason for exterior
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
What is structural frames or systems?
acceptance criteria for concrete works
Who built the sears tower?
What are some structures that may be subjected to fatigue?