If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D
lap length which dia.should I consider for lapping

Answer Posted / naresh

for lapping of two different dia bars we take 40d for lesser
dia

Is This Answer Correct ?    10 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How you read 5x3x1 #4 @ 20" 0/C in steel structure?

1072


How many cement sand ballast in cc 1:4:8 40mm

1534


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

1775


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

1544


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2022






What are the strongest shapes in building?

656


what is conrete grade ,how are depent on concrete grad and size of concrete?

2048


rate analysis hiring of generator 62.5 KVA

1680


how much area can be platered by a mason for exterior

1369


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1642


HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?

2041


What is structural frames or systems?

640


acceptance criteria for concrete works

1683


Who built the sears tower?

639


What are some structures that may be subjected to fatigue?

659