Post New Answer View All Answers
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what is the 0 value in quantity surveying
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
How and where are aqueducts built?
HOw much % of premium on DSR-2013 currently
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Design a rectangular channel.
Mention what are the composition of a landfill?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
how many kg of 20mm, 10mm, dust available in one ton stone boulder
plz.show development and anchorage length in simple diagram.
brickwork labour rate per cum ?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?