Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / vishal gajjar
h(=D-d)\3 * A1+A2+SqrtA1A2 = Q1
A1*A2*thickness = Q2
Q = Q1 + Q2.
| Is This Answer Correct ? | 40 Yes | 11 No |
Post New Answer View All Answers
What is meant by dimensioning?
How do we calculate the power of centrifugal pump?
how to calculate the size of triangular ring in rcc column?
List out some of the software program that can be useful for architect?
why we use 19x9x9and 20x10x10 but not other
What is quantity of cement and sand required for 2000sqft of tiling?
1m square 20mm plastering how much of water need curing work
what is cross hair cursor?
Define What are the uses of alloys in daily life and how are alloys made?
IS code for grade of concrete for bamboo lintel????
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
five requirements of infill panels for walls?
what is a well
What are the alternate material for steel, Sand and aggregate
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?