Answer Posted / mahendran b
Plate load test is carried out in pilling work. After
piling is done it has to tested according to desigin load.
The method for this test is called plate load test. Some
wights (only concrete, not use in sand bags) are kept on pile via plate
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
Why are separation membranes used between concrete pavement slab and sub-base?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How to calculate 1 brss for RCC work
why development length = 50D . why not 100D
what is the maximum number of course that can be laid according to IS code and the max height.
How much cement will require for 1Rmt Skirting laying
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is the steel difference between np-2 and np-3 pipes and weight also
What is the difference between built area and super built up area?
How high should the water tank be to provide a 60 psi at base of this water tower?