1.What is mean by data base testing?explain with example?
2. you can check the data base testing through sql then why
we are using QTP Data base check ?
3.difference between modified waterfall model and waterfall
model?
4.defect life cycle?
Answer Posted / kedar lohe
defect life cycle?
New:When tester finds the defect then he raises the defect
as NEW.
Open:Test Leader or other co workers review it to confirm
that it is defect and make its status as Open.If defect is
not valid then the status is made as rejected.
WIP (Work in progress):When developer is working on this
defect the status of defect is made as WIP.
Fixed:Once the defect is FIXED then developer changes the
status to FIXED.
Closed/Reopen:Tester again test the defect based on the fix
if it is working as expected then made the status as Closed.
If defect is not working as expected then status is changed
to Reopen.
Rejected:If developer thinks that this is not valid defect
then he can change the status to Rejected (By Design)
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is your approach when requirements change continuously?
If there is non reproducible bug which developer is not ready to agree, how you will convince him.
I have interview on Guide wire testing. If you please share me.
what is scrum how with ex?
MS Paint
How to test a Falsh player scrollings?
what risks do u faced u r projest how do you solve
When did u complete testing ? Which scenrio should not be in automation testing ? why ?
What is the difference between functional requirement and non-functional requirement?
What is the main use of preparing a traceability matrix?
can anybody send the project you have tested with the clear descriptions,and recent bugs u found in that
Can anyone please tell in detail about the Rally tool and how a tester is going to use it.
how to write test cases for epos/pos testing.
You may be overqualified for this position we have to offer
Hello everybody, How many people do you think one sprint team can have in average?