what is the difference between compaction and consolidation??
Answer Posted / siddharth singh
Compaction includes removal of air voids while
Consolidation includes removal of excess water.
| Is This Answer Correct ? | 86 Yes | 10 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
why do we provide haunches in rcc box or underpasses?
I need to constructive work in amaraj batteries
Spider cracks occur in beam bottom due to––
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
what pressure the NP2 class RCC pipe can sustain?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
What type of tensile strength is handling by crank in beam? Thanks.
List out some of the checking’s, done at the completion of construction?
Test procedure of fly ash bricks as per code ?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?