Answer Posted / civil6011
The moment which produces bending at a section of a beam or
other structural member; equal to the sum of moments taken
about the center of gravity of that section.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How to arrive dry volume of concrete (1.52 to 1.57) ?
how to find quantity of concrete in PCC M15
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
rate analysis for cement pointing 1:4 , for 100 sq m
What will you do if you encounter problems like accidents?
What are the different approaches in designing the floors of the service reservoirs?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
How much cement and water required for cement selery????
how to caluclate sienerge qty in construction in ap
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What are the different types of civil engineering?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?