How we can calculate what type of supply we need for an
example sometimes we take 11 KV and sometime 33KV from EB ?
Answer Posted / s.a.k
Electricity is generated at 11 Kv, Stepped up and
transmitted over long distances at either 128/66/33 kv to
distribution substations near to the load.
for industrial purpose, 33 kv line is used as per the
requirement & for domestic purpose maximum 240 volts.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
can we do the star delta connection of capacitor for 3- phase motor starter.
List the disadvantages of constant k filters?
How to calculate cable rating for 3 phase supply?
why impedance relay is used for medium transmission line protection
Why negative feedback is preferred in the control system?
Why armature rheostat is kept in maximum position?
brief notes on ammeters
volts=230 c=10mf a=??
various transmission tower like .,D tower ,K.C.O tower ,C.C.O tower,K.C.R tower ,C.C.R tower ,H.C.O tower in different tons.
electrical
What are the symptoms of a bad PG card of a drive (inverter) esp. of Yaskawa Ac Drives (inverters) G7 ?
what is the difference between 2 way and 4 pole selector switch???
WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???
What information we need to prepare relay coordination chart
Can we test the alignment of End shield and stator of turbogenerator without rotor insertion? Also how to fix maintain the alignment at site installation?