how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?

Answer Posted / bhim arya

this is about 4.4cum

Is This Answer Correct ?    4 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

1705


why the profile of shell of natural draught cooling tower is hyperabolic.

1618


Why nautical mile is different from statute mile?

738


Specific gravity of cement?

1210


how to calculate load bearing column

3063






how much cement and sand required for 100sqm of wall plastering in different proportions

1804


What is absolute coordinates?

703


States some of the tool bars used in cad?

679


Why is the statue of liberty made of copper?

656


brickwork labour rate per cum ?

1115


acceptance criteria for concrete works

1688


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1371


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2251


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1675


What is Architect-Prepared Contract?

738