how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?
Answer Posted / bhim arya
this is about 4.4cum
Is This Answer Correct ? | 4 Yes | 10 No |
Post New Answer View All Answers
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
why the profile of shell of natural draught cooling tower is hyperabolic.
Why nautical mile is different from statute mile?
Specific gravity of cement?
how to calculate load bearing column
how much cement and sand required for 100sqm of wall plastering in different proportions
What is absolute coordinates?
States some of the tool bars used in cad?
Why is the statue of liberty made of copper?
brickwork labour rate per cum ?
acceptance criteria for concrete works
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is Architect-Prepared Contract?