how to calculate the steel for beams and columns for tender
purpose? any formula have?
Answer Posted / kumar
Only previous project cosumtion recrod we can do it
| Is This Answer Correct ? | 3 Yes | 11 No |
Post New Answer View All Answers
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What are the basic use of runners and standards of pipelines?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
very simple or less time consuming formula for reinforcement calculation by moment
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
on what basis the partial factor of safety are decided? form the load combinations
How to calculate steel for beam slab and column
What is the difference between linear dimension and aligned dimension?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
is concealed wiring a problem in fly ash brick wall?
How to make tiles floor step by step procedure?