List out the difference between Verification and
Validation.
Answer Posted / swarna
Verification means r we building the right product.
i.e. review document ,Inspection, walkthrough etc.
Validation means r we building the product right.
i.e. run the program and analysis the output.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the automation challenges that sqa(software quality assurance) team faces while testing?
How do you deal with environments that are hostile to quality change efforts?
What would you do if you have a large suite to execute in very less time?
What is the Differnce B/W Quality Management and Quality Control
What is a test strategy and what does it include?
Explain the difference between the verification and validation?
Dear all I need an advice about sqa field last year i have completed my graduation in computer engineering and i have just started my career as Software engineer in QA field and working in a software company. The problem is that I am very confused about my career in this field because I want to know that how much it's necessary that the programming concepts and the programming should be strong if the person is working as a sqa engineer if i talk about myself i can create logic with respect to programming but for me it's very difficult to implement my logic in form of code and is programming field has strong scope over sqa field and as a sqa engineer what will be my prestige in front of programmers. I want to know what appourtinutes i will get in this field after some period of time and what will be the next step(desigination)in that field.Kindly reply Regards
Give me example of automate the regression test suite ........Thanks...
can anyone explain the working of tsys application in credit card industry
Can Parrto Principle be used in Quality Assurance and testing?
Define the role of qa in software development?
What is a bug life cycle?
What is a test plan and what does it include?
Why you choose automated testing over manual testing?
What if the project is not big enough to justify extensive testing?