Answer Posted / swapnil talele
PLC- it is a sequential control system.
where as
DCS- it is a closed loop control system.
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
Explain bernoulli’s theorem. State its application.
what is stroke check for field instument transmetter's & AOV's
what does the ratio 800-400-300-200/1-1-1-1-1 in the specification of current transformer indicates?
What is offset in a control system.
How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?
what are the use of belew gear in general ??
How to Calibrate Ultrasonic flow Transmitter in Field
please tel me the calibration of pneumatic controler.
Explain PID, ON/OFF, Controls
what is sliding spool valves?
Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
Where Can i take a SPI INtools training in Mumbai? In Rolta India Ltd to whom I should approach regarding of SPI INtools Training?
Pl send the model question paper of mahagenco account officer post
How to erection of DCS Panel at site step by step