How can get electrical "c" licence.I am complited in
Deee.Passing year of 1993.Working in pvt cocern lt
Line.Please advise me .Cell no 9994786021
Answer Posted / pvsaravanan
how can get electrical "c" licence.i am complited in
DEEE.PASSING YEAR OF 2004.WORKING IN PVT COCERN LT
LINE.PLEASE ADVISE ME .CELL NO 8056011415
Is This Answer Correct ? | 69 Yes | 24 No |
Post New Answer View All Answers
There is air in a room . the top and bottom of the room are at constant temp. T1 and T2. DRAW THE temp profiles if a. T1 greater than T2 b. T1 less than T2
I FINISHED MY B.TECH IN EEE . I AM IN NEED OF A GOOD TRAINING INSTITUTE TO DO COURSES .. CAN ANYONE SUGGEST GOOD CENTRES IN TAMILNADU ,BANGALORE ,OTHER AREAS???????
can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?
why most of junction box vendors providing T5/T6 Temp class jb's for T3 area any special reason?
Is neutral transformer can be called as control transformer?
How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.
A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.
armature is that part in which current is induced since in dc motor we supply current to the conductor so why we call it armature?
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
Type of motor stater detail and working detail
how electical engineer is related to apsrtc (general) post? if they ask a question in interview as why did u choose this job what shd be answer
Why the unit sizes of hydro generating machines are not standardized as in case of thermal powerplants?
EXPLAIN THE TRANSFORMER MAINTENANCE?
for opening electrical shop, tips needed.
What is Anemometer used to measure?