How can we compact the soil on slope portion? What is the
Grade II of Stone Metal?What type tests carried out on BBM
road?
Answer Posted / g.aravinda kumar
first confirm the profile of the slope and accordingly the
divide the slope profile in horizontal layers of 300mm thk
with divide dimensions and compact as per standard procedure
with extra dimension either side of profile.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What are the uses of groynes?
Process of pcc in wateredug
What black man invented the clothes dryer?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
what is the difference b/w full length and cutting length?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
How many litres of water used for curing of 1000sqft of slav
What is alternate bid?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
How to fix toll charge for a particular vehicle at toll booths in a highway?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what will be price of 1:2:4pcc per kg?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?