5 negative test case for lift....
Answer Posted / karunakar reddy
2,3,4 and 6 are in Positive Approach.We Can Prepare Thease
in Negative approach Also
2.Check for whether the lift will not be stopped in Expected
Floor when
pressed the Wrong number.
3.Check whether (if the lift doors are automatic) the doors
are opened properly only when lift is not running.
4. Check for the indicator Not representing the Another
floor number When We r in Specified Floor.
6. Check for Whether it is not Behaving Normally in
Emergancy time.
| Is This Answer Correct ? | 7 Yes | 7 No |
Post New Answer View All Answers
Explain what is exhaustive testing?
What is the difference between system testing and integration testing?
What is validation in software testing?
How does quality control differ from quality assurance?
How soon the bug should get fixed?
ive been looking for a junior tester job for quite some time now, but most company keep requisting for experienced staffs, but if i dont start from somewhere how do i get the experience
what is the general pattern of explanation of projects in interview, can u ans me plz.......... ex: online banking application
what are the status have in QC(Test Management Tool). and how you report?
Define performance and stress testing?
which sanity testing is performed?
How to validate a Testcase.and is the testing Methodology.
*) Internal review defect gets detected… 1) During peer review. 2) By the own stuff member onsite/offshore. 3) During Informal review process. 4) None of these 5) All of these
Explain accessibility testing and its importance in the present scenario.
Write 2 scenarios for System testing?
How do you perform configuration management with typical revision control systems?