Answer Posted / rj
Sq Dia / 164
Eg for 12mm rod
(12*12)/162
= 144/162
= .888 Kg/Mt
Is This Answer Correct ? | 51 Yes | 6 No |
Post New Answer View All Answers
How to calculate quantity of plum masonry in 1:3:7
How to do rate analysis for concrete work including shuttering work?
Define What glue is least sticky?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is the difference between 53 grade and 43 grade cement
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what is differences between ferrock and concrete ?
mean of NH4 pipe
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
how many tonnes equals to one cubic feet?
what is raft foundation
What is the maximum strength of cub compress strength in one cub testing
The 4 main factors to start a construction project are––