Answer Posted / javed shaikh
100 Ton/m2
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Explain the water bound macadam roag
During reclamation how can the occurrence of mud waves can be rectified?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Explain soil analysis?
Formula of area of crane hook
How to find out kg per Sft ?
How many kilo-newtons equals 1000 kilogram?
How to do base isolation using ETABS software?
reinforcement slab, beam and column formulas?
Basic questions of civil engineering
How to compute minimum number of columns required for a site from area of site?
what is hydrostatic paradox?
Explain what is structural frames or systems?