how do we calculate wastage of steel in the site,what r the
items to taken into account for wastage calculation?
Answer Posted / sjtbehera
wsstage calculation vary from large dia to small dia.
up to 20% we are taken 2.5%
above 20 dia we are calculate as 5%
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What are the important hardware systems used for cad?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is alternate bid?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
Slab quantity
How do we calculate absolute pressure?
Aptitude, reasoning, quants, verbal and technical question
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the procedure of concealed plumbing in toilets?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What is structural frames or systems?
What does civil engineering mean?