how do we calculate wastage of steel in the site,what r the
items to taken into account for wastage calculation?
Answer Posted / sjtbehera
wsstage calculation vary from large dia to small dia.
up to 20% we are taken 2.5%
above 20 dia we are calculate as 5%
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
what is E
significance of specific surface area of particles?
what is project?
how gradation of aggregates effect on slump of fresh concrete?
What is meant by solid geometry?
Where is the worlds longest elevator and how long is it?
Will water damage concrete?
how can we calculate steel value, depending on load
what is mean by reestimation?
What do you mean by honeycomb in concrete?
what is Bearing Capacity,How to determine it?
What is the largest concrete dam in the world?
how much percent are used 20mm,10mm?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.