Answer Posted / mahesh-lanco
The Main Functuion of the Insturments Transformers(Current
Transformer &VOLtage Transformers) is to Standartise the
secondary to less value. As the Relays and Circuit breakers
are designed at Very Low Values(DC).If the fault curent or
voltage is very high there is no meters manufactured for
the measurment of such high volatgaes/currents the
Secondaries of CT &PT are standartized to 5Amp and 100V
respectively
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Why the magneti fields are not passes from southpole to north pole
how to calculate distance between busbar supporters for LT panel, what are the factors influencing in this design
ROC converges if pole and zero lies inside a) origin b) z=1 c) pole d) zero ? Explanation please? if ROC does not converges then?
please send me the previous year's question papers of jindal GET exams
what is mean by drives?
how we decide the require size is this for a known current at fuu load?
Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel
why we are using Load factor?
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
At the starting of dc motor and syn.motor and induction motor high current flowing through the winding. Due to this the windings burnt out. To avoid this different types of starters are used. But incase of transformer what Will be used (At starting no emf is induced in the primary winding)?
What is the difference between voltages or potential difference? And what are they?
Grid fault level [KA]?
Write a note on materials used as a fuse element.
what is a types of short circuit and what is a types of distance protection tests
How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?