Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How the reconcilation of the steel can be done?

Answer Posted / modipraveen

Hi, Reconciliation is only the process to segregate the
payable qty, or non payable that's will mentioned in tender
document. Its very Simple for example take in a account used
steel those are not mentioned in drawing like tie rods,
spacers, chairs, safety anchors etc., those are
reconciliation Qty.

Is This Answer Correct ?    18 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What happens to Load at yielding ?

1397


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2588


Difference between lime, distemper and plastic emulsion?

1718


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

3081


What is the zero value in quantity surveying

2524


Which code is used for tor & tmt steel bar?

1174


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2481


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

1250


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

2049


What is difference between combin footing & rapt footing

1894


Define aligned dimension?

1105


What is the exception critarea of cube?

2516


explain what do you mean by the property development.

2078


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2442


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1906