what is the diffrence betwen one way salb & two way salb?
Answer Posted / johnisaaclugtu
When m is lessthan 0.5 the slab is consider one way and it
is supported by two opposite side,when m is morethan 0.5
the slab is consider to be two way and it is supported on
4 sides.m is the ratio between oposite and adjacent side of
rectangle.
Is This Answer Correct ? | 6 Yes | 9 No |
Post New Answer View All Answers
Why is concrete cube test carried out?
Who name us Engineer & Why?
How to find out kg per Sft ?
What are your future hopes for this job?
What are the methods of measurement? Describe it shortly
if the nitrates more than 45mg/l in water lead to disease then what is it called
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
what is the design procedure for building
explain what do you mean by the property development.
what is shuttering co efficient?
Why joints are provided?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
how to calculate reinforcment in staircase cranked beam?