what"s the minimum content cement allowed in RCC?
Answer Posted / sjtbehera
According to IS:456-2000 Table No-5 minimum cement content
as follows
M20 -300 kg/cum
M25 -300 kg/cum
M30 - 320 kg/cum
M35 - 340 kg/cum
M40 - 360kg/cum
| Is This Answer Correct ? | 90 Yes | 31 No |
Post New Answer View All Answers
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
How do you calculate the power of a centrifugal pump?
In earth work 1300 cum soil how to calculate how many liters require in water
very simple or less time consuming formula for reinforcement calculation by moment
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
all technical question
how we check the thickness and line of ceiling plaster.
What are the ingredients of pre-stressed concrete?
What is absolute pressure? How absolute pressure is calculated?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
how many material required for brickbat water proofing of toilets.
how to calculate total cost for slab 35'×8'
what is relation between SPT N value and driving piles after conducting a soil test?
Who name us Engineer & Why?