For a field Status we define predefault value ="inprogess"
Postdefault value="Completed" a record is copied from an
existing record having status field value "Cleared"
in the copied record if the status field value is made blank
and then saved the record what will be the value of status
field after saving
Answer Posted / sairam
Predefaultvalue is the answer
Is This Answer Correct ? | 2 Yes | 14 No |
Post New Answer View All Answers
Explain what is virtual bc? What is the use of vbc?
How do you display the number of records in a picklist(combo box/drop down) not the records in the pickapplet, in just 3 rows and not 5 rows(which is the default)?
What is symbolic url in siebel?
Explain about the eim tables and base tables are required to your entities?
In a flow, when a Customer has called for enquiring about some product. He does not have any Service tag, Order # or SR#. In this case what kind of Activity will be created and how will the agent proceed with the Activity.
Explain how to create extension table to an interface table in siebel?
Tell me what is the behavior of the eim delete process?
How is netscaler static caching maintained?
Explain what is the difference between links and multi value links?
How do you assign responsibilities to employees in Siebel?
Explain the 5 main functions of the server manger?
Explain what is detailed category in configuration, and its use?
Explain when do we go for dynamic picklist and for pick applet?
What is the difference in the architecture of Siebel x and Siebel x?
What is different between bounded and unbounded picklist?