Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is special features of RGS Rebar detaling software?

Answer Posted / raghu

As the RGS agency itself preparing the BBS we are in big
trouble, they cannot come up with any solution for saving
cut length steel.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Who built the sears tower?

1204


Minimum concrete cover in slabs, columns, beams, foundation and other st?

1269


What is .Dwg?

1290


Define What is aggregate?

1165


Explain the Strength of brick?

1082


How do we calculate absolute pressure?

1347


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

5373


what is difference between fluidity and workability also how palsticizer works

7448


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1801


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2590


what is the design procedure for building

2303


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

2302


what are the five benefits of using standard terminology in the measurement process?

2194


what is the maximum number of course that can be laid according to IS code and the max height.

2080


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

2381